The Right Investment For Tomorrow
1. FIND SUITABLE LAND
Your first step
Finding the right lot is the first step towards your new home. We will initiate your custom design to take into consideration the urban or rural location, lot dimensions, vistas, natural light, the adjacent environment, your lifestyle and, of course, your budget.
LOCATION • DIMENSIONS • VISTAS • NATURAL LIGHT • NEIGHBOURS
Haven’t found a lot yet? Our team can help you!
2. MEET WITH A PROJECT MANAGER
Let’s plan together
Our Project Manager will be your main point of contact with MK General Contractors throughout the design, permitting and construction steps of your project. During your meeting, you will discuss your wish list, establish a budget and plan the road ahead.
- ANSWERS: Our Design Project Manager will answer any and all questions you may still have.
- WISH LIST: You will establish the main elements of your design and create a list of requirements.
- BUDGET : Your overall budget will be divided into the main categories of site preparation, building materials, finishing options, etc.
- ROAD AHEAD: We will provide you with all the information you need to navigate the next steps with ease and confidence.
3. DESIGN YOUR CUSTOM HOME
Bring your vision to life
To maximize your engagement with our unique approach, employ MK General Contractors’ Integrated Design Services, which includes home design, engineering and interior design.
4. FINALIZE PLANS FOR PERMIT
Get official construction approval
When the architectural design of your home is complete, the next step is to gather all the documents required for the building permit application, including:
-
Full architectural plans
-
Structural plans
-
Construction details
We will take care of everything!
Most planning authorities require additional documents to give their green light. Whether it is a tree report or a plumbing layout, our experts will help you find what is needed and how to get it.
5. CHOOSE YOUR INTERIOR DESIGN
Select your finishes
6. SITE PREPARATION & MANUFACTURING
Work in tandem to accelerate your project’s delivery
While your site is being prepared and the foundation is being poured, we will coordinate the manufacture of all the structural components.
7. EXTERIOR AND INTERIOR FINISHING
Once the Structure thermal envelope is up, we will complete the exterior finishing. Simultaneously, the interior partitions, electricity, plumbing and HVAC will be assembled to ensure a hassle-free turnkey project.
Exterior Finishes
Harmonious exterior finishes are the key to a beautiful project. Choose traditional with wood, stucco and masonry or contemporary with steel and concrete panels. The choice is yours.